Tussock Design

The year

Three semesters and a final month

About twelve months: three semesters of three months, a three-week break after each, and a month at the end to finish the Handbook and present it.

This is the proposed shape, and it is open to your input. The dates below assume a 1 June 2027 start; an April start moves everything two months earlier and keeps the order.

  1. June to August 2027 · winterSemester 1: the ground and the weather
  2. SeptemberThree weeks off
  3. September to December 2027 · springSemester 2: how New Zealand builds and lives
  4. Christmas and New YearThree weeks off
  5. January to April 2028 · summer into autumnSemester 3: design, the house as the test
  6. AprilThree weeks off
  7. May 2028The final month: the Handbook finished and presented

Semester 1: the ground and the weather

The question: what does a New Zealand house have to survive, and where?

Hazard and climate-zone maps of the country. Case studies such as the 2023 Auckland floods and Cyclone Gabrielle, and the Canterbury and Kaikōura earthquakes. The codes and standards each hazard has to meet. The first precedents redrawn.

Ends with the proposal review: a one-page thesis statement, the annotated sources and the hazard maps.

Semester 2: how New Zealand builds and lives

The question: what do New Zealand homes use, make and depend on, and what fails first?

The fieldwork semester, through the spring: homesteads and off-grid homes, builders, suppliers and councils. Materials and systems compared by cost, carbon, supply and repair. Energy, water, wastewater and food.

Ends with the mid review: the fieldwork record, the comparisons and the first chapters in draft.

Semester 3: design, the house as the test

The question: does the guidance hold up when it is drawn?

The base house and its modules designed against each hazard, as a rural new build, an urban new build and an urban renovation. These become the Handbook's worked examples. The precedent library is finished and the hazard-and-response matrix completed.

Ends with the pre-final review: the Handbook in draft, the worked examples and the matrix.

The final month

The Handbook finished as a reference book, and presented to the developer and the panel. A brief for a second year, if one makes sense, and a handover.

Running through all three

Learning from traditional Māori building and materials, as research, reviewed by a Māori advisor. And the monthly pin-up with the developer.

Room to adjust. The full scope is more than one year holds. This shape puts design inside the year and keeps food and refuge to shorter chapters drawn from published work. A research-only year, or a narrower one, are both possible, and so is a second year focused on design.